The shipbuilder Navantia has chosen MAN engines to power new ships. The vessels were ordered by the Royal Australian Navy (RAN). Every vessel will have two MAN 18V 32/40 main engines and four MANs 7L21/31, which will be delivered at the end of 2017 and the middle of 2018.