Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

A tidal Energy System has officially launched and is now providing clean power to Nova Scotia's electricity system, making it the first tidal energy to flow into the grid in Canada. Grand Passage's groundbreaking initiative is backed by $28.5 million in funding from the Canadian government - one of the largest tidal energy investments in Canada's history. Sustainable Oceans is working to provide the world's first floating tidal array at FORCE (Fendi Ocean Energy Research Centre). The vast tidal energy resource of the Bay of Fundy contains more than four times the total flow of every freshwater river in the world and has the potential to generate around 2,500 megawatts of green energy. Nova Scotia has allocated approximately 30 megawatts of capacity through FORCE's demonstration permit and berths for developers to demonstrate the effectiveness, costs and environmental impacts associated with this new form of energy production.

Published in Blog EN

The Stellwagen Bank National Marine Sanctuary of the Oceanic Energy Administration (BOEM) and the National Oceanic and Atmospheric Administration (NOAA) announced Wednesday the successful digital acoustic tagging of 14 sei whales off the coast of Massachusetts. The sei whale is one of the most endangered large whales in the North Atlantic. This is the first time researchers have successfully tagged an endangered species in the United States using an unmanned aerial vehicle (UAV) or drone. Drones enable researchers to target specific animals in a group or to tag groups.

Published in Blog EN

UK-based subsea services company Modus has commissioned its control room in Darlington, UK. The launch is the culmination of a £24 million ($29.8 million) investment plan. Modus uses a subsea hybrid autonomous underwater vehicle (HAUV) to map underwater topography and inspect pipelines, cables and subsea structures. The vehicles can be deployed internationally and operated from the Darlington control room.

Published in Blog EN

Ohmsett is the only organization in the United States that conducts comprehensive oil spill response research and training in the use of live oil. It is also being used to test renewable energy technologies such as marine hydrodynamic generators. As part of BSEE's ongoing maintenance programme, Ohmsett has undergone major renovations over the past eight months. The facility undergoes extensive maintenance every five years, including the dismantling, dismantling and inspection of major equipment. U.S. Coast Guard Atlantic Commandos assisted BSEE in refilling the largest 667-foot wave tank of its kind in North America with seawater from Sandy Hook Bay.

The three-day operation ends on March 24, 2022. Testing, research and training have resumed for domestic and foreign customers as part of the maintenance of the facility is complete. Clients have quickly booked their spots and filled Ohmsett's schedule for the rest of the year.e

Published in Blog EN

The Glosten-designed vessel will replace the existing RV Thuwal, which was originally designed as a fishing vessel in Australian coastal waters. The RV will be equipped with advanced positioning systems to enable long-term long-range and autonomous vehicle deployment as well as geoscience sampling systems.

Published in Blog EN

CorPower Ocean will unveil its next-generation C4 wave energy converter and its new "CorPack concept", providing the cornerstone for future wave energy farms. The unveiling will take place on June 15 in Stockholm, Sweden. The CorPower C4 device will be designed as part of a four-system wave energy array located off the coast of Agusadura.

Published in Blog EN

CRP Subsea has invested in a new precision-engineered manufacturing cell to support its growing manufacturing production needs. The dedicated cell expanded its machining capabilities by introducing a 5-axis CNC (Computer Numerical Control) machine and a 3-axis turning center. The new unit will be used to produce the internal clamps of the distributed buoyancy modules.

Published in Blog EN

Bayonet Ocean Vehicles was formed following the acquisition of C-2 Innovations' line of undersea crawling robots. Headquartered in Plymouth, Massachusetts, the company shares with Greensea a newly renovated 17,000-square-foot manufacturing facility with waterfront access for year-round testing and training. The robots have been renamed the Bayonet 150, Bayonet 250 and Bayonet 350 vehicles. Their applications include amphibious operations and coastal warfare, such as mine detection and mine clearance.

Published in Blog EN

Through years of work and experience in solving construction and production problems, more and more science has been incorporated into products and processes. Increasingly, self-developed electronics, a development laboratory, computer programs, and computer-aided informatics and organizations were used. At the end of the 60's, the" Research and Development" unit was established, and at the end of the 70's, the "Jugoturbine Institute". The development of basic products remained in the working organizations for the production of steam turbines, engines and pumps, but more and more laboratories, computer capacities, development and investment engineers were concentrated in the Institute, which reached 330 employee's in the mid-1980s.

Published in Blog EN

Education as one of the most important determinants of the factory's survival was incomplete without a complete concept, with an insufficient number and uncoordinated structure of employees. For a example is the fact that in times of financial crisis, the company employed 35 graduate mechanical engineers, which was still insufficient given the volume of production. Due to the need for workers, a comprehensive and comprehensive program of support for education and engagement of workers has been defined.

Published in Blog EN
Page 40 of 48