Sterlite Power has commissioned the Lakadia-Vadodara Transmission Project Limited in Gujarat, which aims to transmit over 5,000 MW of renewable energy from Bhuj and Kutch to the national grid. The Rs 2,024 crore project will link the Lakadia substation with Vadodara through a 335km transmission line. It is an important part of the world's largest 30,000 MW hybrid renewable energy park to be completed in Kutch. Sterlite Power managing director Pratik Agarwal said the project will accelerate India's 500 GW renewable energy vision by 2030.