Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/libraries/cms/application/cms.php on line 460

Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/models/item.php on line 881
Tuesday, 23 January 2024 14:31

Enauta Set to Receive Key Equipment for Atlanta Field Offshore Brazil

Written by
Rate this item
(0 votes)

Brazilian oil and gas company Enauta has delivered the first multiphase subsea pumping system (MPP) from Norway to support oil and gas production at the Atalanta field in Brazil’s Santos Basin. The equipment, manufactured by OneSubsea, was loaded in Norway on January 21, 2024 and then shipped to Brazil. Enauta’s FPSO Atalanta, supplied by Malaysia’s Yinson Production, is expected to be installed starting in mid-2024 and will have a total of six production wells. The unit has a production capacity of 50,000 barrels per day and a maximum storage capacity of 1.251 million barrels.


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/adriads/public_html/components/com_k2/templates/default/item.php on line 248
Read 184 times