UK-based offshore energy supply chain Balmoral Comtec has secured a multi-million dollar contract from Ørsted to supply cable protection systems for its Hornsea 3 offshore wind project. The contract includes design engineering, supply of 400 cable protection systems and handling and installation training. Balmoral Comtec’s patented system is designed to improve the operational performance and fatigue life of underwater cables. Hornsea 3 is the world’s largest offshore wind farm and is expected to be operational by 2027.