Tuesday, 09 August 2022 15:41

First WinGD iCER on-engine solution ordered for LNG carrier

Written by
Rate this item
(0 votes)

WinGD's iCER (Intelligent Control of Exhaust Gas Recirculation) engine solution will be delivered to a new 17400 cbm LNG carrier as part of the WinGD X-DF 2.1 engine. The carrier is being built by South Korea's Hyundai Heavy Industries (HHI), with engine deliveries scheduled for May 2024. It features second-generation technology for better combustion control, resulting in lower emissions and fuel savings across the entire load range. Methane leakage can be reduced by up to 50%.

Read 960 times