The world's first 36,000-hour dual-fuel engine overhaul has been completed on an LNG tanker in Malaysia. SK Audace uses six WinGD X62DF twin engines developed by the Swiss marine power company Winterthur Gas & Diesel (WinGD). The overhaul was carried out by CMS Korea at the Malaysian Marine and Heavy Engineering (MMHE) shipyard in June 2022.