Sinopec (Sinopec Corp.) plans to produce 20,000 tons of green hydrogen per year when the facility is completed. The plant is located in the northwestern region of Xinjiang and cost about $470.8 million to build. The hydrogen produced by the future plant will be supplied to the neighboring Sinopec Tahe Refinery to replace natural gas for hydrogen production.