Terra-Gen said it has completed the second phase of financing for its Edwards Sanborn solar storage facility in Kern County, California. The project phase includes 410 MWac of nameplate solar capacity (358 MWac at the interconnection point) and 1,786 MWh of battery storage. The company said it is moving forward with future phases that are expected to include more than 2,000 megawatts of incremental solar and energy storage.