Novi Pazar is the third city in Serbia to install a biomass heating plant after Mali Zvornik and Priboj. The heating plant, with a capacity of 8 MW and two auxiliary units, 4.5 MW and 7 MW, will be fueled by natural gas. KfW provided the loan, and the Swiss National Secretariat for Economic Affairs approved the grant.