French subsea power cable manufacturer Nexans has completed offshore export cable pulling work at the Moray West offshore wind farm in Scotland. The operation was carried out using a Nexans Aurora cable-laying vessel. The project is being developed by Ocean Winds as part of a joint venture between Engie and EDP Renewables. The next step is to energize the first circuit. Amazon will purchase 473 megawatts of clean electricity from wind farms.